无码人妻一区二区三区免费看,午夜影视免费,极品妇女扒开粉嫩小泬,国产顶级熟妇高潮xxxxx

Welcome to the official website of Shenzhen Taiyou Electronic Technology Co., Ltd!

Shenzhen Taiyou Electronic Technology Co., Ltd

20年專注于立式注塑機(jī)的生產(chǎn)與制造

24小時(shí)全國(guó)服務(wù)熱線:0755-33855605

Shenzhen Taiyou Electronic Technology Co., Ltd

Address: No.2, North 1st Road, Tianyang Third Road, datianyang Industrial Zone, Songgang town, Bao'an District, Shenzhen
Telephone:0755-33855605
Fax:0755-33855606
E-mail:twtaiyou@163.com
Website:http://www.sdhph.cn

當(dāng)前位置:首 頁(yè) ? News ? Industry trends

Six steps to choose the right machine for vertical injection molding machine

文章出處:臺(tái)佑電子 | 作者:臺(tái)佑電子 | 發(fā)表時(shí)間:2020-07-06

1. Obtain: Whether the "mold opening stroke" and "mold support stroke" are enough to take out the finished product depends on the mold and the finished product. The opening stroke of the mold should be at least twice the height of the finished product in the direction of mold opening and closing, and should include the gate length. The stroke of the mold support should be sufficient to launch the finished product;


2. Shoot well: "Screw compression ratio" and "shooting pressure" are determined by plastic. Some engineering plastics require a higher injection pressure and a suitable screw compression ratio design to obtain better molding results. Therefore, in order to make the finished product shoot better, the injection pressure and compression ratio should also be considered when selecting the screw. In general, a screw with a smaller diameter can provide a higher injection pressure.


3. Choose the appropriate model: the model and series are determined by the product and plastic. Because there are many types of injection machines, it is necessary to correctly determine at the beginning which injection machine or series should be used to produce this product, such as general thermoplastic or bakelite raw materials or polyester raw materials, they are single color, double color, multi Color, sandwich color or mixed color. In addition, some products require high stability (closed loop), high precision, high rate of fire, high ignition pressure or rapid production (multi-loop). The appropriate series must be selected for production.


4. Coordination: According to the size of the mold, determine whether the "large column inner distance", "mold thickness", "small mold size" and "template size" of the machine are suitable to confirm whether the mold can fit. The width and height of the mold should be less than or at least one side should be less than the distance between the large columns. The width and height of the mold are preferably within the size range of the template; the thickness of the mold should be between the thickness of the injection molding machine. The width and height of the mold should meet the small mold size recommended by the injection molding machine, and it is too small; so far, the specifications of the mold clamping device have been initially determined, and the tonnage of the model has been roughly determined. Then, the following steps must be performed to confirm which injection unit has a screw diameter that meets the requirements.


5. Shoot fast: and confirm the "shooting speed". Some finished products require high injection rate and high speed to be stable, such as ultra-thin finished products. In this case, it may be necessary to confirm whether the machine's injection rate and injection rate are sufficient, and whether it is necessary to match the pressure accumulator, closed loop control and other devices. In general, under the same conditions, a screw capable of providing a higher ignition pressure usually has a lower ignition rate. On the contrary, a screw capable of providing a lower ignition pressure usually has a higher ignition rate. Therefore, when selecting the screw diameter, it is necessary to consider and select the injection amount, injection pressure, and injection rate (injection speed).


6. Full injection: According to the weight of the finished product and the number of die holes, determine the required "injection amount" and select the appropriate "screw diameter". When calculating the weight of the finished product, the number of die holes (a few holes per die) should be considered; for stability, the injection volume should be greater than 1.35 times the weight of the finished product, that is, the finished product weight should be within 75% of the injection volume;

咨詢

Telephone

Consultation telephone

0755-33855605

Service hotline

13902910763

WeChat

二維碼

Mobile website

Mailbox

Enterprise mailbox

twtaiyou@163.com

国产成人精品免费视频大全五级| 麻豆国产av超爽剧情系列| 欧美性欧美巨大黑白大战| 欧美成人精品一区二区综合a片| 亚洲国产天堂久久综合| 亚洲中文精品久久久久久| 狠狠精品干练久久久无码中文字幕| 男女猛烈无遮挡免费视频| 欧美大片va欧美在线播放| 亚洲av永久天堂在线观看| 884aa四虎影成人精品| 无码一区二区三区av免费| 亚洲伊人久久综合成人| 中文人妻无码一区二区三区信息| 人妻aⅴ中文字幕无码| 天天摸天天做天天爽| 777精品久无码人妻蜜桃| 久久久精品2019免费观看| 色综合久久久久综合一本到桃花网 | 久久久久青草线蕉亚洲麻豆| 乱子伦视频在线看| 国产在线不卡一区二区三区| 久久天天躁狠狠躁夜夜avapp| 人妻大战黑人白浆狂泄| 国产精品成人久久小草| 日韩视频 中文字幕 视频一区| 中文有码视频在线播放免费 | 亚洲日韩穿丝袜在线推荐| 国产精品激情| 久久精品av一区二区三| 欧美日韩久久久精品a片| 超碰国产精品久久国产精品99| 成人综合区另类小说区| 激情综合婷婷色五月蜜桃| 欧美人与动牲猛交xxxxbbbb| 又爽又黄又无遮挡的视频| 久久综合伊人77777| 久久99精品久久久久久久不卡| 色婷婷色综合激情国产日韩| 欧妇女乱妇女乱视频| 亚洲夜色噜噜av在线观看|